1. Project overview
Project Name: 247,000 tons/year fourth-generation fluorine-containing functional new material project (Phase I)
Construction unit: Shandong Aofan New Material Co., Ltd
Construction site: Gaoqing Chemical Industrial Park
Nature of Construction: Expansion
Project investment: 200 million yuan
Construction content and scale: The project is located in Gaoqing Chemical Industrial Park. The company has a 34,000-ton/year fourth-generation new fluorine material project in the east, a planned longitudinal second road in the south to Caijia Village, a planned longitudinal second road in the west, and a branch river road in the north. It mainly constructs a chloromethane production unit, as well as a storage tank for raw materials and finished products, supporting auxiliary engineering facilities, and purchases more than 200 sets of reaction kettles, centrifuges, condensers, etc. and supporting equipment. After the project is completed, the annual output 100,000 tons of chloromethane.
This project involves existing engineering and environmental protection: the existing project is 34,000 tons/year of fourth-generation new fluorine materials, the acid gas in the process waste gas is pretreated by secondary alkali spray, and the organic waste gas is pretreated by secondary condensation + secondary activated carbon After adsorption treatment, it is discharged through a 30m high exhaust pipe to meet the standard; production wastewater and domestic sewage are pretreated by the sewage treatment station in the factory area and connected to the sewage pipe network in the park; the main equipment noise is vacuum units, fans, pumps, circulating water pumps, cooling towers and other equipment noise, through sound insulation and shock absorption and other treatment measures, the factory boundary can meet the standard; the hazardous waste is handed over to qualified units for treatment.
2. Name and contact information of the construction unit
Construction unit name: Shandong Aofan New Material Co., Ltd
Company mailing address: Gaoqing Chemical Industrial Park
Contact: Manager Yang
Contact number: 13070672738
3. The name of the unit that prepared the environmental impact report
EIA unit: Nanjing Kehong Environmental Protection Technology Co., Ltd
Contact: Geng Gong
Contact number: 025-85280708
E-mail: 1550162282@qq.com
4. Web link to the public comment form
If you have any comments or opinions on this project, you can fill in the public opinion form for environmental impact assessment of construction projects as required, and you should fill in the suggestions and opinions related to the environmental impact and environmental protection measures of this project. Web link to the public opinion form:
http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html
5. Ways and means of submitting public comment forms
If the public has any comments on the project, they can complete the "Public Opinion Form" as required, and the public can submit relevant environmental impact assessments to the construction unit by letter, email or other means during the preparation of the environmental impact report exposure draft. comments and suggestions.
Announcement issuing unit: Shandong Aofan New Material Co., Ltd
Announcement time: November 11, 2022